Service Stories
STORIES OF OUR STRENGTH:
A west coast refinery contacted us with a one week lead time for a planned shutdown of their 100,000CFM steam turbine. We were able to package, deliver and seamlessly insert 4 of our units with no interruption of their work flow. Supplying equipment for this type of planned outage is our specialty.
Often we are called in an emergency situation where a large machine has failed and operations have ceased. One such incident involved a 120,000CFM unit in Louisiana. Our multiple unit rental package got the refinery back up and running.
Our high pressure packages have been very useful in coal burning power plants where they are used as soot blowers. The ease of installation and reliability of the units have gained us repeat business in this arena.
Our machines have been rented as far north as Montreal, Canada where one of our 30,000CFM units was delivered in the middle of winter in negative 20 degree temperatures. The extreme circumstances required extreme measures and a tent had to be erected around the machine to keep it warm enough to function.
